Water & Wastewater Facilities, Design & Engineering |
|
| Design-Build - General Construction |
| Project Dates |
Client |
Contract Amount |
| 6/07 – 10/07 |
Spectraserv, Inc. – Kearny Facility
Design, permitting and construction of a new enclosed residuals transfer station (7000 Sq.Ft.) and an enclosed dewatering building loading area (2000 Sq. Ft.) including electrical, plumbing and HVAC work and State approved air pollution control units for each enclosure. |
$1,200,000 |
| 5/96 – 9/98 |
Wagner Correctional Facility
New Jersey – Department of the Treasury
Division of Building & Construction
Design/Build and permitting of a 800,000 gallons per day wastewater treatment facility. Contract includes the O & M of an existing plant during construction. |
$3,900,000 |
| 6/93 – 7/97 |
Mountainview Correctional Facility
New Jersey – Department of the Treasury
Division of Building & Construction
Design/Build and permitting of a 360,000 gallons per day advanced wastewater treatment plant. Project included construction of grit removal system, primary clarifier, equalization tanks, biological treatment tanks and UV treatmentsystem. Treated effluent is discharged to both a surfacewater and groundwater receiving system. |
$3,742,000 |
| 2/91 – 6/91 |
Spectraserv, Inc. – Kearny Facility
Design, permitting and construction of a sludge dewatering station; truck maintenance garage; four (1 million gallon) above ground storage tanks; new dock and bulkhead; 1 story (4,000 Sq.Ft.) employee locker / lunch building; and 3 story (22,000 Sq.Ft.) office building. |
$4,000,000 |
|
|  |